Home / Case Studies / Continental

Continental
Construction

When building materials were being lost in the snow, a construction company turned to Njordair to provide a storage & workshop tent for a high altitude site.

Client

Continental Construction, headquartered in Naples, Florida are a luxury homebuilder specialising in the construction of properties in Florida and Montana.

 

 

Problem

In the winter of 2017/2018 Continental Construction approached Njordair for assistance on a construction project in the mountains of Montana. The problem was that due to high levels of snowfall, building materials were often being lost under the snow. This meant that materials were mistakenly being re-ordered and extra labour was needed to dig out building materials from underneath snow drifts each day.

 
 
 
 

Solution

Njordair manufactured a 17 metre long (56’) x 13m wide (43’) inflatable ‘air beam’ Fast Tent and delivered it via air freight to Montana, USA. Although setting up a Fast Tent is quick and requires no specialist skills, two installers from Njordair then travelled to Montana to assist with the initial set-up. Continental Construction decided to split the tent in two halves and use each one as an 8.5m (28’) temporary structure for storing materials and equipment during the winter.

In the mountains of Montana, The Fast Tent withstood snow loads from the first night it was installed. Following successful performance of the first tents supplied, Continental ordered an additional Fast Tent to be used as a fabrication shed / workshop.

More case studies

What are the best tent options for you?

Explore the Fast Tent range to find the right solution for your industry.

If our standard range of tent widths is not suitable, we can design a completely custom size and shape tent. Contact our team with your requirements.

Protection for all conditions

Rugged & Rapidly Deployed Construction Tent System